Estimated cost of a breakwater in a community that has been active in fishing and requires marine infrastructure. A rubble mound breakwater of 70m length, 10m wide and 20m depth was proposed to protect a fishing agriculture wharf from wind and waves. Costs include rubble mound fill, dredging, engineering and inspection.