Inter-tidal reefs

To address the risk of erosion the construction of two inter-tidal reefs built from 2,400 tonnes of Island stone, each measuring 30x10m wide and installed 45 metres offshore. These structures reduce storm wave impacts and encourage sand accumulation, increasing beach...

Rubble Mound Breakwater in Conne River

Estimated cost of a breakwater in a community that has been active in fishing and requires marine infrastructure. A rubble mound breakwater of 70m length, 10m wide and 20m depth was proposed to protect a fishing agriculture wharf from wind and waves. Costs include...