This project involves the conceptual design of an Array of 16 groynes built with 7,000m3 of material each. Each structure is assumed to be 50 m long with side slopes of 2H:1V and is composed of layered materials: 500 m³ of each heavy rock armour, light rock armour, underlayer and shot rock core material, and beach fill using approximately 5,000 m³ of sand.
Recent Comments