Estimate of costs from an evaluation of a restoration scenarios in the Lynn River subwatershed with 59 wetland restoration locations from ALUS. Costs include the engineering and construction activities (earth excavation, grading, berm construction, installation of minor water-control structures, site preparation, and native vegetation planting) and administration, design, permitting, and coordination costs. In addition, operational costs of about 609$/ha/yr would be paid for inconvenience costs, ongoing management and maintenance ( vegetation upkeep, inspection, repairs).
Search
Recent Posts
- Connected Resilience: Atlantic Adaptation Conference – Thank you!
- Connected Resilience: Atlantic Adaptation Conference May 27 & 28
- Climate Adaptation Stories: Shoreline Adaptation at Lake Banook
- Climate Adaptation Stories: Using Nature to Adapt to Coastal Erosion in Halifax
- Climate Adaptation Stories: Eelgrass and Coastal Resilience
Recent Comments