Estimate of costs from an evaluation of a restoration scenarios in the Lynn River subwatershed with 59 wetland restoration locations from ALUS. Costs include the engineering and construction activities (earth excavation, grading, berm construction, installation of minor water-control structures, site preparation, and native vegetation planting) and administration, design, permitting, and coordination costs. In addition, operational costs of about 609$/ha/yr would be paid for inconvenience costs, ongoing management and maintenance ( vegetation upkeep, inspection, repairs).