Estimation of wetland restoration administration and engineering costs for southern Ontario from Ducks Ulimited Canada applied to an evaluation of 59 candidate wetland resoration locations in the Lynn River subwatershed. Costs includes engineering and construction activities (including administration and design). In addition, operational costs of about 4 200$/ha/yr would be paid for inconvenience costs, ongoing management and maintenance ( vegetation upkeep, inspection, repairs).
Search
Recent Posts
- Connected Resilience: Atlantic Adaptation Conference – Thank you!
- Connected Resilience: Atlantic Adaptation Conference May 27 & 28
- Climate Adaptation Stories: Shoreline Adaptation at Lake Banook
- Climate Adaptation Stories: Using Nature to Adapt to Coastal Erosion in Halifax
- Climate Adaptation Stories: Eelgrass and Coastal Resilience
Recent Comments