Carleton Park Redevelopment Pond

Passive stormwater retention pond that captures and biologically treats parking area flows. Cost includes pond shaping and development, drainage/retention structures, wetland and edge planting, 250m trail development around pond and 11% contingencies fee.

Agricultural Wetland Pilot Project 2

Wetland constructed on agricultural land that can’t be farmed due to land being too wet. They will help provide ecosystem benefits and are designed to filter sediments and nitrates from water coming off the adjacent fields. Wetland estimated to be approximately...

Agricultural Wetland Pilot Project 1

Wetland constructed on agricultural land that can’t be farmed due to land being too wet. They will help provide ecosystem benefits and are designed to filter sediments and nitrates from water coming off the adjacent fields. Wetland estimated to be approximately...

Mill Creek Stormwater Pond

Construction of a naturalized stormwater pond to improve stormwater management and support future residential development. The cost of the project was funded by the Government of Canada through the Canada Housing Infrastructure Fund and included excavation of the...

Mill Creek Wetland

A study conducted in the Mill Creek Watershed consisted of estimating the costs of maintaining wetlands and developing additional constructed wetlands to ensure enough storage capacity to offset increased peak flow associated with 100-year storms. The study assumed...