A study conducted in the Mill Creek Watershed consisted of estimating the costs of maintaining wetlands and developing additional constructed wetlands to ensure enough storage capacity to offset increased peak flow associated with 100-year storms. The study assumed...
by David Taiaroa | May 18, 2026
This study uses an existing constructed wetland as a case study to estimate the costs and treatment capacity of a potential larger treatment wetland system. This cost represents the estimation for a wastewater treatment wetland system that would meet the treatment...
by David Taiaroa | May 18, 2026
Cette étude utilise une zone humide artificielle existante comme cas d’étude afin d’estimer les coûts et la capacité de traitement d’un système potentiel de zone humide de traitement à plus grande échelle. Ce coût correspond à l’estimation...