Construction of a naturalized stormwater pond to improve stormwater management and support future residential development. The cost of the project was funded by the Government of Canada through the Canada Housing Infrastructure Fund and included excavation of the catchment area, vegetation, and other low-maintenance natural features to filter stormwater.