by David Taiaroa | Jun 26, 2026
Stormwater Detention Facility project developed to manage peak stormwater flows generated by ongoing and future development. The proposed solution includes three underground detention tanks working in a series.
by David Taiaroa | Jun 26, 2026
Stormwater Detention Facility project developed to manage peak stormwater flows generated by ongoing and future development. The proposed solution includes an engineered surface retention pond.
by David Taiaroa | Jun 26, 2026
An engineered stormwater management pond consisting of an excavated earth basin with graded side slopes, gravel and an impermeable liner. The pond includes engineered inlet and outlet structures constructed of concrete
by David Taiaroa | Jun 26, 2026
Conceptual cost of an underground storage chamber system, which could be installed beneath existing parking areas. These require regular maintenance to ensure long-term performance, including sediment and debris removal.
by David Taiaroa | Jun 26, 2026
Stormwater Detention Facility project developed to manage peak stormwater flows generated by ongoing and future development. The proposed solution includes three underground detention tanks working in a series and an engineered surface retention pond. (total system...
Recent Comments