by David Taiaroa | Jun 26, 2026
This study explores the feasibility of implementing four pavement types: permeable concrete, permeable asphalt, interlocking pavers, and conventional asphalt. This is the cost for conventional impermeable pavement with a longevity of about 20-30 years until needing...
by David Taiaroa | Jun 26, 2026
Cost estimate for the replacement of approximately 70m of water/sewer main, including the installation of 5 manholes and miscellaneous piping. Total sewage project costs, including inspection and engineering.
by David Taiaroa | Jun 26, 2026
Organization that partners with non-profit groups and municipalities throughout Canada to host sales of rain barrels and tanks. Cost for 1000L rain tank (average across Atlantic Canada locations)
by David Taiaroa | Jun 26, 2026
Organization that partners with non-profit groups and municipalities throughout Canada to host sales of rain barrels and tanks. Cost for 220L rain barrel with diverter (average across Atlantic Canada locations).
by David Taiaroa | Jun 26, 2026
Conceptual design and costs for shoreline adaptation measures. The concept includes a new storm sewer system installed behind a proposed seawall to collect surface runoff from adjacent properties. This system would comprise new catch basins and sewer piping that...
Recent Comments