Matheson Pond

An engineered stormwater management pond consisting of an excavated earth basin with graded side slopes, gravel and an impermeable liner. The pond includes engineered inlet and outlet structures constructed of concrete

Williams Lake Dam

Removal and replacement of an old dam. The project includes the construction of a new dam (just over 20m wide), the infilling of 236m2 of freshwater habitat through placement of concrete and riprap and the restoration of the old site after removal.

Stormwater detention facility (tanks only)

Stormwater Detention Facility project developed to manage peak stormwater flows generated by ongoing and future development. The proposed solution includes three underground detention tanks working in a series.

Stormwater detention facility (pond and tanks)

Stormwater Detention Facility project developed to manage peak stormwater flows generated by ongoing and future development. The proposed solution includes three underground detention tanks working in a series and an engineered surface retention pond. (total system...