by David Taiaroa | Jun 17, 2026
Cost estimation of a vegetated stormwater pond as part of a flood mitigation plan. The bottom elevation of the pond would be 4m.
by David Taiaroa | Jun 17, 2026
Cost estimation of a vegetated stormwater pond as part of a flood mitigation plan. The bottom elevation of the pond would be 4.6m.
by David Taiaroa | Jun 17, 2026
A study conducted in the Mill Creek Watershed consisted of estimating the costs of maintaining wetlands and developing additional constructed wetlands to ensure enough storage capacity to offset increased peak flow associated with 100-year storms. The study assumed...
by David Taiaroa | Jun 17, 2026
Construction of a naturalized stormwater pond to improve stormwater management and support future residential development. The cost of the project was funded by the Government of Canada through the Canada Housing Infrastructure Fund and included excavation of the...
by David Taiaroa | Jun 17, 2026
Wetland constructed on agricultural land that can’t be farmed due to land being too wet. They will help provide ecosystem benefits and are designed to filter sediments and nitrates from water coming off the adjacent fields. Wetland estimated to be approximately...
Recent Comments