A study conducted in the Mill Creek Watershed consisted of estimating the costs of developing naturalized stormwater ponds with the required storage volume to offset runoff from peak flows associated with 100-year storms. Long-term cost estimations assumes a useful...
by David Taiaroa | May 18, 2026
A study conducted in the Mill Creek Watershed consisted of estimating the costs of developing naturalized stormwater ponds with the required storage volume to offset runoff from peak flows associated with 100-year storms. This is the estimated total lifecycle cost for...
by David Taiaroa | May 18, 2026
Construction of a naturalized stormwater pond to improve stormwater management and support future residential development. The cost of the project was funded by the Government of Canada through the Canada Housing Infrastructure Fund and included excavation of the...
by David Taiaroa | May 18, 2026
Aménagement d’un bassin de rétention des eaux pluviales naturalisé afin d’améliorer la gestion des eaux pluviales et de favoriser le développement résidentiel futur. Le coût du projet a été financé par le gouvernement du Canada par l’entremise du Fonds canadien...