by David Taiaroa | Jun 17, 2026
The restoration of two branches of a river included dismantling existing structures, removing embankments, and restoring vegetation along the surrounding riverbanks. As a result, biodiversity was improved and ecological conditions were returned closer to their natural...
by David Taiaroa | Jun 17, 2026
This hybrid project is a restoration and stabilization of eroding clay riverbank. Cost over two years for excavation, construction and placement of cages with natural bioremediation media along the embankment toe to reinforce and protect against further collapse into...
by David Taiaroa | Jun 17, 2026
Riparian zone naturalization to stabilize river’s edge. Cost includes planting of 30 trees, general planting, application of stabilization mix (topsoil, planting & hydroseed blend) and an 11% contingencies fee
by David Taiaroa | Jun 17, 2026
The study evaluated the opportunity costs of implementing riparian buffer policies. This cost is for a buffer of 30m restored and revegetated. Average opportunity costs were calculated for forested lands using a wood supply model.
by David Taiaroa | Jun 17, 2026
The study evaluated the opportunity costs of implementing riparian buffer policies. This cost is for a buffer of 60m restored and revegetated. Average opportunity costs were calculated for forested lands using a wood supply model.
Recent Comments