by David Taiaroa | Jun 26, 2026
The study identifies three potential strategies to protect the Chignecto Isthmus from climate change impacts such as rising sea levels and increased storm surge. Option C – Raise existing dyke embankments and add steel sheet pile walls at constrained or...
by David Taiaroa | Jun 26, 2026
The study identifies three potential strategies to protect the Chignecto Isthmus from climate change impacts such as rising sea levels and increased storm surge. Option B – Construct a new inland dyke alignment, straighter and set back from the existing dykes,...
by David Taiaroa | Jun 26, 2026
The study identifies three potential strategies to protect the Chignecto Isthmus from climate change impacts such as rising sea levels and increased storm surge. Option A – Raise existing dyke embankments along their current alignment to a protection level of...
by David Taiaroa | Jun 26, 2026
Cost estimation for a conventional hard-infrastructure alternative to the Mahone Bay Living Shoreline Project. Armoured seawall at a relatively steep slope (priced assuming an aesthetically pleasing seawall face)
by David Taiaroa | Jun 26, 2026
Cost analysis study to assess a stream daylighting project. The stream is currently buried and conveyed through a culvert. The study also estimates the cost of replacing the culvert for a new one of approximately 200m. Costs include new culvert and installation
Recent Comments