by David Taiaroa | Jun 26, 2026
This study explores the feasibility of implementing four pavement types: permeable concrete, permeable asphalt, interlocking pavers, and conventional asphalt. This is the cost for conventional impermeable pavement with a longevity of about 20-30 years until needing...
by David Taiaroa | Jun 26, 2026
After Hurricane Fiona the 16th Hole at Crowbush Cove Gold Course needed major repairs. Over 4000 tonnes of armour stone was placed along the shore and sand from the beach was cast over the stone to restore its natural look.
by David Taiaroa | Jun 26, 2026
Estimated cost of a breakwater in a community that has been active in fishing and requires marine infrastructure. A rubble mound breakwater of 70m length, 10m wide and 20m depth was proposed to protect a fishing agriculture wharf from wind and waves. Costs include...
by David Taiaroa | Jun 26, 2026
To address the risk of erosion the construction of two inter-tidal reefs built from 2,400 tonnes of Island stone, each measuring 30x10m wide and installed 45 metres offshore. These structures reduce storm wave impacts and encourage sand accumulation, increasing beach...