by David Taiaroa | May 29, 2026
Land converted into a rain garden in a public park setting, planted with about 200 native perennial flowers, grasses and ferns. An interpretive sign was installed on site so visitors can learn about rain gardens.
by David Taiaroa | May 29, 2026
Land converted to rain garden with 145 plants and two rain barrels to capture rainfall and reduce potential flooding around the building.
by David Taiaroa | May 29, 2026
Land converted into a rain garden in a public park with over 400 plants to reduce local flooding and ease strain on the sewer system and nearby houses.
by David Taiaroa | May 29, 2026
Estimate of costs from an evaluation of a restoration scenarios in the Lynn River subwatershed with 59 wetland restoration locations from ALUS. Costs include the engineering and construction activities (earth excavation, grading, berm construction, installation of...
by David Taiaroa | May 29, 2026
Estimation of wetland restoration administration and engineering costs for southern Ontario from Ducks Ulimited Canada applied to an evaluation of 59 candidate wetland resoration locations in the Lynn River subwatershed. Costs includes engineering and construction...
Recent Comments